Power
Sites under control with completed power studies and secured interconnection pathways. Capacity confirmed at the substation.
Power Secured. Compute Delivered.
Big Star turns our powered sites into live AI capacity so you can deploy your compute in months, not years.
Every AI build is waiting on power.
The grid sets the schedule.
The interconnection queue runs 3 to 7 years.
We are already through it.
Development-ready sites available now.
We control every stage between the substation and live compute.
Sites under control with completed power studies and secured interconnection pathways. Capacity confirmed at the substation.
Zoning, permitting, and environmental pre-clearance finished before you arrive.
Prefabricated AI deployment pods built to suit, ready to deploy.
Rack-scale NVL72 platforms and AMD® Helios™ systems, liquid-cooled at density, from Blackwell™ Ultra to Vera Rubin™ and AMD Instinct™.
Live capacity for training and inference, monitored around the clock.
Power, hardware, and factories form one supply chain. We control all three links of it.
Owned sites, direct utility pathways, on-site turbine generation, substations from 44.7 to 138 kV. The megawatts come first.
Transformers to 300 MVA, UL 891 switchgear, GE® and Mitsubishi® turbines, cooling and pods, through direct manufacturer channels.
Prefabricated pods of 288 GPUs, one cooling loop, one delivery cadence, commissioned in under 12 months.
Secured power, allocated in order of commitment. Your platform, your megawatts, your timeline. We come back with a site match and a delivery schedule.